Front-End Engineering (FEE), or Front-End Engineering Design (FEED), is a technical design approach used to control project expenditures and plan the project thoroughly before the proposed bidding is submitted. This can also be referred to as Pre-project planning (PPP), front-end loading (FEL), feasibility analysis, or preliminary project planning.


Video Front-end engineering



Ikhtisar

The FEE is a basic technique that comes after a Conceptual design or Feasibility study. The FEE design focuses on technical requirements as well as rough investment costs for the project. The FEE can be divided into separate packages covering different parts of the project. The FEE package is used as the basis for the Phase Execution Contract offer (EPC, EPCI, etc.) and is used as the design basis.

A good FEE will reflect all client project specific requirements and avoid significant changes during the execution phase. The FEE contract usually takes about 1 year to complete larger projects. During the FEE phase there is close communication between Project Owners and Operators and Engineering Contractors to meet project-specific requirements.

The Front-End technique focuses on technical requirements and identifies key costs for the proposed project. This is used to set prices for the project implementation stage and to evaluate potential risks. This is usually followed by Detailed Design (or Detailed Engineering). The amount of time invested in Front-End Techniques is higher than traditional offerings, because project specifications are thoroughly extracted and the following are usually developed in detail:

  • Project Organizational Chart
  • Project Scope
  • Civil engineering, mechanical and chemical engineering defined
  • HAZOP, security and ergonomic studies
  • 2D & amp; 3D initial model
  • Equipment layout and installation plan
  • Development of engineering design package
  • List of main tools
  • Automation strategy
  • Process Flow Chart
  • Project schedule
  • Quote quotes are

Traditionally, all of these documents will be developed in detail during the design review after the citations are approved. Companies using FEE will develop this material before submitting an offer.

Front-end techniques are typically used by design/build engineering firms. These companies can operate in various industries including:

  • Automation
  • Chemical processing
  • Construction
  • EPC
  • Equipment design
  • Manufacturing
  • Pharmacy
  • Petrochemicals
  • System process design
  • Production line design
  • Enhance
  • Machine Vision

Maps Front-end engineering



FEE Methodology

FEE Methodology: FEE is a way of viewing a project before completing a detailed design. There is no established way to study Front-End Techniques. Generally, FEE requires an engineer or a group of engineers to thoroughly and logically consider the proposed project. Examples of considerations may include:

  • Degree of automation - depending on the application under consideration, automation may or may not be appropriate. Determining the amount of automation in the project will help determine equipment, labor costs, layout, and design.
  • Rates and levels - to reach a certain level or level, for example, production, certain equipment, materials and automation may be required. Determining the main rates and parameters will greatly affect the overall project cost and timeline
  • Material specifications - Not all materials work properly, or can withstand physical applications. Basic engineering disciplines are determining materials of construction, material compatibility, etc.
  • Standards and guidelines - each industry has standards and guidelines, and many industries are regulated. Equipment, production facilities, manufacturing lines, etc. Developed for this industry must meet these standards and regulations and can have a major impact on project cost/time of completion
  • Assumptions, Exceptions, and Potential Problems: FEE seeks to identify potential problems, assumptions or exceptions that may affect the project during implementation. Identifying this during the front-end planning stage so that they can be accountable is the goal of FEE.

The feed also includes the outline and Expansion stage occurring in the future, although the timeline is not specifically stated for the expansion. In such cases, the plot areas allocated for expansion at some stage are usually not violated.

Become a Front-End Engineer and Designer: Wear Two Valuable Hats ...
src: uploads.toptal.io


References


Lean Engineering Framework | Alopex on Innovation
src: alopexoninnovation.files.wordpress.com


External links

  • The Construction Institute

Source of the article : Wikipedia

Comments
0 Comments